Global Warming Images
 

Return to Thumbnail Page Return to thumbnails

Image No: IMG_2533_workman    

 
The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The tower and turbine is then fixed onto the transition piece.  

Downloadable sizes

Format

Web use only - 1MB* RGB
A5** - 10MB RGB
A4** - 25MB RGB

*Images sizes are approximate and give a guide to size only.
**Print size is approximate and indicative only. No guarantee is given for exact sizes.

Please contact us for larger sizes and further information.

Download Preview

To download the image shown right click (mac, ctrl+click) on the image. Select the Save Image As... option from the menu that appears. Choose the destination where you wish to save the image.


The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The tower and turbine is then fixed onto the transition piece.

Dong Energy Dong energy power electricity renewable renewable energy green clean environment wind farm offshore offshore wind farm Walney Barrow in Furness Cumbria UK climate change global warming carbon footprint turbine wind wind power wind energy green energy clean energy turbine construction industry Irish Sea transition piece piling monopile crane workman PPE

 

Send to Friend Send to Friend
Add to Lightbox - Lightbox

 

     
Rights Managed Price calculator - Please select the license options that you require from below. You will need to select from the first drop down menu and then other options will display in the following drop down menus. You will need to select all available fields before clicking on the Calculate License Price link.

Usage
Size
Print Run
Start Date
Price £N/A
  Calculate License Price Calculate License Price