Image No: IMG_3341_turbine |
|
|
 |
|
Downloadable sizes |
Format |
| Web use only - 1MB* |
RGB |
| A5** - 10MB |
RGB |
| A4** - 25MB |
RGB |
*Images sizes are approximate
and give a guide to size only.
**Print size is approximate and
indicative only. No guarantee is given for exact sizes.
Please contact us for larger sizes
and further information.
Download Preview
To download the image shown right click (mac, ctrl+click) on the image. Select
the Save Image As... option from the menu that appears. Choose
the destination where you wish to save the image.
|
The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
coast
Wales
North Wales
Mostyn renewable energy
climate change
global warming
clean energy
green energy
wind turbine
wind farm
wind power
wind
electricity
power
offshore
offshore wind farm
Walney
port
dock
turbine
construction
steel
technology
Siemens
Dong Energy
energy
power
power company
energy company
cone
nose cone
|
|
Send to Friend
- Lightbox
|
| |
|
|
|
|