Image No: IMG_7408_tall |
|
|
 |
|
Downloadable sizes |
Format |
| Web use only - 1MB* |
RGB |
| A5** - 10MB |
RGB |
| A4** - 25MB |
RGB |
*Images sizes are approximate
and give a guide to size only.
**Print size is approximate and
indicative only. No guarantee is given for exact sizes.
Please contact us for larger sizes
and further information.
Download Preview
To download the image shown right click (mac, ctrl+click) on the image. Select
the Save Image As... option from the menu that appears. Choose
the destination where you wish to save the image.
|
The jack up barge, Kraken, loaded with wind turbines for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
Barrow in Furness
Cumbria
UK
coast
renewable energy
renewable
wind power
wind turbine
wind farm
offshore
offshore wind farm
Walney
Walney Offshore Wind Farm
color
colorful
carbon neutral
green
environment
industry
heavy industry
construction
construction industry
green job
green employment
steel
green investment
jack up barge
off shore
red
crane
lifting
heavy lifting
blade
turbine blade
man
men
workman
high vis
health and safety
PPE
helmet
protection
transition piece
yellow
ladder
climb
climbing
ladder climbing
working at height
|
|
Send to Friend
- Lightbox
|
| |
|
|
|
|
|