*Images sizes are approximate
and give a guide to size only.
**Print size is approximate and
indicative only. No guarantee is given for exact sizes.
Please contact us for larger sizes
and further information.
Download Preview
To download the image shown right click (mac, ctrl+click) on the image. Select
the Save Image As... option from the menu that appears. Choose
the destination where you wish to save the image.
Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge, Goliath on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.