Image No: IMG_1501_tractor |
|
|
 |
|
Downloadable sizes |
Format |
| Web use only - 1MB* |
RGB |
| A5** - 10MB |
RGB |
| A4** - 25MB |
RGB |
*Images sizes are approximate
and give a guide to size only.
**Print size is approximate and
indicative only. No guarantee is given for exact sizes.
Please contact us for larger sizes
and further information.
Download Preview
To download the image shown right click (mac, ctrl+click) on the image. Select
the Save Image As... option from the menu that appears. Choose
the destination where you wish to save the image.
|
Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows blades being prepared to be lifted.
Mostyn
Wales
north Wales
port
docks
wharf
coast
Dong
Siemens
power
energy
electricty
renewable
renewable energy
renewable power
wind
wind power
wind energy
wind turbine
turbine
offshore
wind farm
construction
blade
huge
workman
blade
tractor
yellow
JCB
lifter
hydraulic
lifting
crane
heavy lifting
|
|
Send to Friend
- Lightbox
|
| |
|
|
|
|