Global Warming Images
 

 
IMG_3810_hydro pipe.jpg The pipecarrying water from Coedty reservoir to Dolgarrog Hydro Power Station in Snowdonia, North Wales.
 
IMG_3810_hydro pipe
Add to Lightbox - Lightbox

 
IMG_3814_car.jpg The pipecarrying water from Coedty reservoir to Dolgarrog Hydro Power Station in Snowdonia, North Wales.
 
IMG_3814_car
Add to Lightbox - Lightbox

 
IMG_3816_road.jpg The pipecarrying water from Coedty reservoir to Dolgarrog Hydro Power Station in Snowdonia, North Wales.
 
IMG_3816_road
Add to Lightbox - Lightbox

 
IMG_3826_Wales.jpg Dinorwig power station visitor centre, called electric mountain, in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3826_Wales
Add to Lightbox - Lightbox

 
IMG_3833_banner.jpg Dinorwig power station visitor centre, called electric mountain, in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3833_banner
Add to Lightbox - Lightbox

 
IMG_3839_poster.jpg Dinorwig power station visitor centre, called electric mountain, in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3839_poster
Add to Lightbox - Lightbox

 
IMG_3840_visitor centre.jpg Dinorwig power station visitor centre, called electric mountain, in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3840_visitor centre
Add to Lightbox - Lightbox

 
IMG_3848_electric mountain.jpg Dinorwig power station visitor centre, called electric mountain, in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3848_electric mountain
Add to Lightbox - Lightbox

 
IMG_3849_pelton wheel.jpg Pelton Wheels outside Dinorwig hydro power station visitor centre in Llanberis, Snowdonia, North Wales.
 
IMG_3849_pelton wheel
Add to Lightbox - Lightbox

 
IMG_3854_Wales.jpg Dinorwig power station in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3854_Wales
Add to Lightbox - Lightbox

 
IMG_3859_Dinorwig powe r plant.jpg Dinorwig power station in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3859_Dinorwig powe r plant
Add to Lightbox - Lightbox

 
IMG_3862_snowdonia.jpg A shaft above Dinorwig power station in Llanberis, Snowdonia, North wales. Dinorwig is an Hydro power station that uses off peak cheap electricity to pump water up the mountain, which is then released during periods of peak demand to supply electricity via hydro turbines into the national grid.
 
IMG_3862_snowdonia
Add to Lightbox - Lightbox

 
IMG_5017_yellow river hyfro.jpg In 2008 China became the worlds largest emitter of greenouse gases, fuelled by high levels of economic growth and electricity mainly being generated by dirty, highly polluting coal fired power stations. The Chinese are also investing heavily in renewable energy projects. Here a dam across the Yellow River at Sanmanxie produces Hydro electricity.
 
IMG_5017_yellow river hyfro
Add to Lightbox - Lightbox

 
IMG_5018_crane.jpg In 2008 China became the worlds largest emitter of greenouse gases, fuelled by high levels of economic growth and electricity mainly being generated by dirty, highly polluting coal fired power stations. The Chinese are also investing heavily in renewable energy projects. Here a dam across the Yellow River at Sanmanxie produces Hydro electricity.
 
IMG_5018_crane
Add to Lightbox - Lightbox

 
IMG_5020_rock.jpg In 2008 China became the worlds largest emitter of greenouse gases, fuelled by high levels of economic growth and electricity mainly being generated by dirty, highly polluting coal fired power stations. The Chinese are also investing heavily in renewable energy projects. Here a dam across the Yellow River at Sanmanxie produces Hydro electricity.
 
IMG_5020_rock
Add to Lightbox - Lightbox

 
IMG_5026_dammed.jpg In 2008 China became the worlds largest emitter of greenouse gases, fuelled by high levels of economic growth and electricity mainly being generated by dirty, highly polluting coal fired power stations. The Chinese are also investing heavily in renewable energy projects. Here a dam across the Yellow River at Sanmanxie produces Hydro electricity.
 
IMG_5026_dammed
Add to Lightbox - Lightbox

 
IMG_7143_circular.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7143_circular
Add to Lightbox - Lightbox

 
IMG_7144_stainless steel.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7144_stainless steel
Add to Lightbox - Lightbox

 
IMG_7146 (1)_yellow.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7146 (1)_yellow
Add to Lightbox - Lightbox

 
IMG_7148_turbine hall.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7148_turbine hall
Add to Lightbox - Lightbox

 
IMG_7150 (1)_tool box.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall with one of the turbines undergoing its annual service.
 
IMG_7150 (1)_tool box
Add to Lightbox - Lightbox

 
IMG_7152_red.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall with one of the turbines undergoing its annual service.
 
IMG_7152_red
Add to Lightbox - Lightbox

 
IMG_7153_circle.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7153_circle
Add to Lightbox - Lightbox

 
IMG_7157_girder.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7157_girder
Add to Lightbox - Lightbox

 
IMG_7160_turbine head.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7160_turbine head
Add to Lightbox - Lightbox

 
IMG_7165_yellow.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the turbine hall.
 
IMG_7165_yellow
Add to Lightbox - Lightbox

 
IMG_7167_first aid.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows a first aid kit in the main turbine hall.
 
IMG_7167_first aid
Add to Lightbox - Lightbox

 
IMG_7173_turbine hall.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows a cleaner, claning the main turbine hall.
 
IMG_7173_turbine hall
Add to Lightbox - Lightbox

 
IMG_7177 (1)_turbine.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the main turbine hall.
 
IMG_7177 (1)_turbine
Add to Lightbox - Lightbox

 
IMG_7178_purple.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows the main turbine hall.
 
IMG_7178_purple
Add to Lightbox - Lightbox

 
IMG_7180_angle.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows valves that control the water going into the turbines.
 
IMG_7180_angle
Add to Lightbox - Lightbox

 
IMG_7184_steel.jpg Fljotsdalur hydro power station part of Karahnjukar a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, dam height 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows valves that control the water going into the turbines.
 
IMG_7184_steel
Add to Lightbox - Lightbox

Media Per Page