Global Warming Images
 

 
IMG_0842_teeth.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0842_teeth
Add to Lightbox - Lightbox

 
IMG_0852_bend.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0852_bend
Add to Lightbox - Lightbox

 
IMG_0854_curved.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0854_curved
Add to Lightbox - Lightbox

 
IMG_0859_curve.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0859_curve
Add to Lightbox - Lightbox

 
IMG_0868_saw tooth.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0868_saw tooth
Add to Lightbox - Lightbox

 
IMG_0875_serrated.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0875_serrated
Add to Lightbox - Lightbox

 
IMG_0885_saw.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_0885_saw
Add to Lightbox - Lightbox

 
IMG_1011_blade.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1011_blade
Add to Lightbox - Lightbox

 
IMG_1022_aerodynamic.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1022_aerodynamic
Add to Lightbox - Lightbox

 
IMG_1029_aerofoyle.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1029_aerofoyle
Add to Lightbox - Lightbox

 
IMG_1041_serrations.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1041_serrations
Add to Lightbox - Lightbox

 
IMG_1045_serrated.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1045_serrated
Add to Lightbox - Lightbox

 
IMG_1049_nose cone.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1049_nose cone
Add to Lightbox - Lightbox

 
IMG_1050_tooth.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1050_tooth
Add to Lightbox - Lightbox

 
IMG_1054_teeth.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the huge blades, the serrations help to control the air flow over the blade for greater efficiency and extra power.
 
IMG_1054_teeth
Add to Lightbox - Lightbox

 
IMG_9537_teeth.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows blades on the quayside.
 
IMG_9537_teeth
Add to Lightbox - Lightbox

 
IMG_6733_blades.jpg The jack up barge, Kraken, loaded with wind turbine blades for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_6733_blades
Add to Lightbox - Lightbox

 
366W0974_London.jpg Trains in Paddington Station london UK
 
366W0974_London
Add to Lightbox - Lightbox

 
IMG_1003_migration.jpg Skeins of Pink Footed Geese flying over the Lake District, UK. Migration patterns of wild fowl are starting to be affected by climate change.
 
IMG_1003_migration
Add to Lightbox - Lightbox

 
IMG_1005_skein.jpg Skeins of Pink Footed Geese flying over the Lake District, UK. Migration patterns of wild fowl are starting to be affected by climate change.
 
IMG_1005_skein
Add to Lightbox - Lightbox

 
366W0974.jpg Trains in Paddington Station london UK
 
366W0974
Add to Lightbox - Lightbox

 
366W4969.jpg A skein of geese flying, UK. Fewer numbers of Geese are migrating to the UK now as favourable conditions can be found closer to their breeding grounds as the arctic warms up rapidly.
 
366W4969
Add to Lightbox - Lightbox

Media Per Page