Global Warming Images
 

 
IMG_5984_christmas tree lights.jpg A tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_5984_christmas tree lights
Add to Lightbox - Lightbox

 
IMG_5994_dusk.jpg A tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_5994_dusk
Add to Lightbox - Lightbox

 
IMG_5997_tree lights.jpg A tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_5997_tree lights
Add to Lightbox - Lightbox

 
IMG_6006_zoom.jpg A tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6006_zoom
Add to Lightbox - Lightbox

 
IMG_6016_concept.jpg An abstract of a tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6016_concept
Add to Lightbox - Lightbox

 
IMG_6019_swirling.jpg An abstract of a tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6019_swirling
Add to Lightbox - Lightbox

 
IMG_6022_lighting.jpg An abstract of a tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6022_lighting
Add to Lightbox - Lightbox

 
IMG_6025_swirl.jpg An abstract of a tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6025_swirl
Add to Lightbox - Lightbox

 
IMG_6026_Christmas lights.jpg An abstract of a tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6026_Christmas lights
Add to Lightbox - Lightbox

 
IMG_6027_lights.jpg A tree decorated with lights for Christmas in East Boldon, North East, UK.
 
IMG_6027_lights
Add to Lightbox - Lightbox

 
IMG_0680_tunnel.jpg An ancient Beech hedgeline on Exmoor, Devon on the River Barle near Simonsbath.
 
IMG_0680_tunnel
Add to Lightbox - Lightbox

 
IMG_0683_tree trunk.jpg A woman walking on a highly wooded section of the South West Coast path between Porlock in somerset and Lynton in Devon.
 
IMG_0683_tree trunk
Add to Lightbox - Lightbox

 
IMG_2102_woodland.jpg An old moss covered tree decaying on the forest floor in ancient woodland near Dulverton, Devon, UK.
 
IMG_2102_woodland
Add to Lightbox - Lightbox

 
IMG_2107_moss.jpg An old moss covered tree decaying on the forest floor in ancient woodland near Dulverton, Devon, UK.
 
IMG_2107_moss
Add to Lightbox - Lightbox

 
IMG_1161_arrival.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, with the jack up barge, Krakken arriving at night.
 
IMG_1161_arrival
Add to Lightbox - Lightbox

 
IMG_1167_quay.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1167_quay
Add to Lightbox - Lightbox

 
IMG_1171_floodlit.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1171_floodlit
Add to Lightbox - Lightbox

 
IMG_1178_cover.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1178_cover
Add to Lightbox - Lightbox

 
IMG_1180_screw thread.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1180_screw thread
Add to Lightbox - Lightbox

 
IMG_1183_blur.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1183_blur
Add to Lightbox - Lightbox

 
IMG_1184_night shift.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1184_night shift
Add to Lightbox - Lightbox

 
IMG_9705_night time.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9705_night time
Add to Lightbox - Lightbox

 
IMG_9709_red crane.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9709_red crane
Add to Lightbox - Lightbox

 
IMG_9712_blur.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9712_blur
Add to Lightbox - Lightbox

 
IMG_9719_zoom.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9719_zoom
Add to Lightbox - Lightbox

 
IMG_9729_yellow.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9729_yellow
Add to Lightbox - Lightbox

 
IMG_9739_weldex.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9739_weldex
Add to Lightbox - Lightbox

 
IMG_9743_worker.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9743_worker
Add to Lightbox - Lightbox

 
IMG_9746_red.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9746_red
Add to Lightbox - Lightbox

 
IMG_9750_boom.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a nose cone being lifted.
 
IMG_9750_boom
Add to Lightbox - Lightbox

 
IMG_9761_night worker.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9761_night worker
Add to Lightbox - Lightbox

 
IMG_9766_jib.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9766_jib
Add to Lightbox - Lightbox

Media Per Page