Global Warming Images
 

 
20111217_0297.jpg The launch that carries tourists on Coniston Water in the Lake District, powered by solar panels.
 
20111217_0297
Add to Lightbox - Lightbox

 
20111217_0298.jpg The launch that carries tourists on Coniston Water in the Lake District, powered by solar panels.
 
20111217_0298
Add to Lightbox - Lightbox

 
IMG_1864_air pollution.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_1864_air pollution
Add to Lightbox - Lightbox

 
IMG_1866_polution.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_1866_polution
Add to Lightbox - Lightbox

 
IMG_2933_pollution.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_2933_pollution
Add to Lightbox - Lightbox

 
IMG_2941_filthy.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_2941_filthy
Add to Lightbox - Lightbox

 
IMG_2944_black.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_2944_black
Add to Lightbox - Lightbox

 
IMG_2947_marine diesel.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_2947_marine diesel
Add to Lightbox - Lightbox

 
IMG_2951_exhaust.jpg Exhaust emissions, the result of burning marine diesel in a ships engine. Marine diesel is one of the most polluting fuels in the world.
 
IMG_2951_exhaust
Add to Lightbox - Lightbox

 
IMG_3872_skipper.jpg The bridge of the offshore support vessel being used by Dong Energy to ferry staff out to the offshore wind farm, Barrow in Furness, Cumbria, UK.
 
IMG_3872_skipper
Add to Lightbox - Lightbox

 
IMG_3884_controls.jpg The bridge of the offshore support vessel being used by Dong Energy to ferry staff out to the offshore wind farm, Barrow in Furness, Cumbria, UK.
 
IMG_3884_controls
Add to Lightbox - Lightbox

 
IMG_4428 (1)_cloud.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_4428 (1)_cloud
Add to Lightbox - Lightbox

 
IMG_7779_nuclear power station.jpg A ferry sailing past a nuclear power station on the River Tees, Teesmouth, UK.
 
IMG_7779_nuclear power station
Add to Lightbox - Lightbox

 
IMG_7780_nuclear power.jpg A ferry sailing past a nuclear power station on the River Tees, Teesmouth, UK.
 
IMG_7780_nuclear power
Add to Lightbox - Lightbox

 
IMG_0687_ice.jpg A ferry boat reflected in Lake Windermere, Lake District, UK.
 
IMG_0687_ice
Add to Lightbox - Lightbox

 
IMG_8344_boat.jpg A tourist launch on Lake Windermere reflected in the lake surface, Lake District, UK.
 
IMG_8344_boat
Add to Lightbox - Lightbox

 
IMG_8356_launch.jpg A tourist launch on Lake Windermere reflected in the lake surface, Lake District, UK.
 
IMG_8356_launch
Add to Lightbox - Lightbox

 
IMG_8469_life belt.jpg A tourist launch on Lake Windermere reflected in the lake surface, Lake District, UK.
 
IMG_8469_life belt
Add to Lightbox - Lightbox

 
IMG_8548_reflection.jpg A tourist launch on Lake Windermere reflected in the lake surface, Lake District, UK.
 
IMG_8548_reflection
Add to Lightbox - Lightbox

 
IMG_0853_cool.jpg A boat locked in the ice on Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0853_cool
Add to Lightbox - Lightbox

 
IMG_8399_boat.jpg Waterhead in Ambleside on Lake Windermere at sunset, Lake District, UK.
 
IMG_8399_boat
Add to Lightbox - Lightbox

 
IMG_4428_water.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_4428_water
Add to Lightbox - Lightbox

 
IMG_0768_Mallard.jpg Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0768_Mallard
Add to Lightbox - Lightbox

 
IMG_0842_frozen in.jpg A boat locked in the ice on Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0842_frozen in
Add to Lightbox - Lightbox

 
IMG_0852_buoy.jpg A boat locked in the ice on Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0852_buoy
Add to Lightbox - Lightbox

 
IMG_6794_disruption.jpg The Keswick launch locked into the ice on Derwent Water in Keswick during the December 2010 big chill.
 
IMG_6794_disruption
Add to Lightbox - Lightbox

 
IMG_6920_Derwent Water.jpg Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_6920_Derwent Water
Add to Lightbox - Lightbox

 
IMG_0772_ferry stoppage.jpg Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0772_ferry stoppage
Add to Lightbox - Lightbox

 
IMG_0773_weather disruption.jpg Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0773_weather disruption
Add to Lightbox - Lightbox

 
IMG_0841_cold snap.jpg A boat locked in the ice on Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0841_cold snap
Add to Lightbox - Lightbox

 
IMG_0845_ice lake.jpg A boat locked in the ice on Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0845_ice lake
Add to Lightbox - Lightbox

 
IMG_0853_frozen lake.jpg A boat locked in the ice on Derwent Water at Keswick in the Lake District completely frozen over during the December 2010 big chill.
 
IMG_0853_frozen lake
Add to Lightbox - Lightbox

Media Per Page