Global Warming Images
 

 
IMG_0456_p.jpg A techinician fitting roof brackets to a house roof in Ambleside, Cumbria, UK, to support solar photo voltaic panels.
 
IMG_0456_p
Add to Lightbox - Lightbox

 
IMG_0456_hammer.jpg A techinician fitting roof brackets to a house roof in Ambleside, Cumbria, UK, to support solar photo voltaic panels.
 
IMG_0456_hammer
Add to Lightbox - Lightbox

 
IMG_8289_tools.jpg Tools on the deck of the jack up barge,  Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8289_tools
Add to Lightbox - Lightbox

 
IMG_2739_barge.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2739_barge
Add to Lightbox - Lightbox

 
IMG_2742_grey.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2742_grey
Add to Lightbox - Lightbox

 
IMG_2746_calm.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2746_calm
Add to Lightbox - Lightbox

 
IMG_2752_sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2752_sea
Add to Lightbox - Lightbox

 
IMG_2760_precision.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2760_precision
Add to Lightbox - Lightbox

 
IMG_2764_yellow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2764_yellow
Add to Lightbox - Lightbox

 
IMG_2766_fitting.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2766_fitting
Add to Lightbox - Lightbox

 
IMG_2781_construction.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2781_construction
Add to Lightbox - Lightbox

 
IMG_2813_green.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2813_green
Add to Lightbox - Lightbox

 
IMG_2816_goliath.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2816_goliath
Add to Lightbox - Lightbox

 
IMG_3006_legs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_3006_legs
Add to Lightbox - Lightbox

 
IMG_3010_piling.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_3010_piling
Add to Lightbox - Lightbox

 
IMG_3017_circle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_3017_circle
Add to Lightbox - Lightbox

 
IMG_3030_view.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_3030_view
Add to Lightbox - Lightbox

 
IMG_3965_rescue.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_3965_rescue
Add to Lightbox - Lightbox

 
IMG_4025_supplies.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4025_supplies
Add to Lightbox - Lightbox

 
IMG_4029_circle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4029_circle
Add to Lightbox - Lightbox

 
IMG_4030_rusty.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4030_rusty
Add to Lightbox - Lightbox

 
IMG_4032_low loader.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4032_low loader
Add to Lightbox - Lightbox

 
IMG_4035_piling.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4035_piling
Add to Lightbox - Lightbox

 
IMG_4038_foundation.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4038_foundation
Add to Lightbox - Lightbox

 
IMG_2720_Irish Sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2720_Irish Sea
Add to Lightbox - Lightbox

 
IMG_2739_Dong Energy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2739_Dong Energy
Add to Lightbox - Lightbox

 
IMG_2742_crane.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2742_crane
Add to Lightbox - Lightbox

 
IMG_2752_yellow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2752_yellow
Add to Lightbox - Lightbox

 
IMG_2760_sea bed.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2760_sea bed
Add to Lightbox - Lightbox

 
IMG_2764_transition piece.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2764_transition piece
Add to Lightbox - Lightbox

 
IMG_2766_construction.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2766_construction
Add to Lightbox - Lightbox

 
IMG_2772_engineering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2772_engineering
Add to Lightbox - Lightbox

Media Per Page