Global Warming Images
 

 
12630024_red.jpg A candle used to spell the word Hot
 
12630024_red
Add to Lightbox - Lightbox

 
IMG_8566_helmet.jpg The jack up barge, The Goliath lifting a transition pieces into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8566_helmet
Add to Lightbox - Lightbox

 
IMG_8593_high vis.jpg A crane on the jack up barge, Goliath.
 
IMG_8593_high vis
Add to Lightbox - Lightbox

 
IMG_8659_life vest.jpg A massive crane lifts a 320 tonne transition piece onto the deck of the jack up barge, The Goliath ready to take out to the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8659_life vest
Add to Lightbox - Lightbox

 
IMG_3433_birdoswold.jpg An organic cheese stand at a local food event.
 
IMG_3433_birdoswold
Add to Lightbox - Lightbox

 
IMG_3438_cheese.jpg An organic cheese stand at a local food event.
 
IMG_3438_cheese
Add to Lightbox - Lightbox

 
IMG_5774 (1)_p.jpg The Bowland Wild Boar Park is a tourist attraction that lies in a remote area of Bowland near Chipping in Lancashire, UK. The site is off grid, having no mains electricity. The whole site is powered by solar PV panels, with solar water heaters and a wind turbine, with a diesel generator providing backup power. This shots shows a solar PV array as well as scaffolders preparing a barn roof for a new solar panel instalation, with solar water on the right hand roof.
 
IMG_5774 (1)_p
Add to Lightbox - Lightbox

 
IMG_0379_bucket.jpg The Krakken, a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_0379_bucket
Add to Lightbox - Lightbox

 
IMG_8085_night time.jpg The jack up barge, The Goliath prepares to lift a transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8085_night time
Add to Lightbox - Lightbox

 
IMG_8086_decking.jpg The jack up barge, The Goliath prepares to lift a transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8086_decking
Add to Lightbox - Lightbox

 
IMG_8103_space.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8103_space
Add to Lightbox - Lightbox

 
IMG_8112_wire.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8112_wire
Add to Lightbox - Lightbox

 
IMG_8129_dawn shift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8129_dawn shift
Add to Lightbox - Lightbox

 
IMG_8131_night shift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8131_night shift
Add to Lightbox - Lightbox

 
IMG_8134_sky.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8134_sky
Add to Lightbox - Lightbox

 
IMG_8139_night shift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8139_night shift
Add to Lightbox - Lightbox

 
IMG_8142_night work.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8142_night work
Add to Lightbox - Lightbox

 
IMG_8147_night lift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8147_night lift
Add to Lightbox - Lightbox

 
IMG_8148_gloaming.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8148_gloaming
Add to Lightbox - Lightbox

 
IMG_8154_deck.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8154_deck
Add to Lightbox - Lightbox

 
IMG_8159_dawn.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8159_dawn
Add to Lightbox - Lightbox

 
IMG_8167_vista.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8167_vista
Add to Lightbox - Lightbox

 
IMG_8183_unbolt.jpg Workers next to a 320 tonne transition piece on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8183_unbolt
Add to Lightbox - Lightbox

 
IMG_8194_wire.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8194_wire
Add to Lightbox - Lightbox

 
IMG_8195_helmet.jpg Workers on the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8195_helmet
Add to Lightbox - Lightbox

 
IMG_8197_night shift.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8197_night shift
Add to Lightbox - Lightbox

 
IMG_8198_eye protection.jpg Workers on the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8198_eye protection
Add to Lightbox - Lightbox

 
IMG_8202_PPE.jpg Workers on the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8202_PPE
Add to Lightbox - Lightbox

 
IMG_8203_crane hook.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8203_crane hook
Add to Lightbox - Lightbox

 
IMG_8211_workmen.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8211_workmen
Add to Lightbox - Lightbox

 
IMG_8217_dawn.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8217_dawn
Add to Lightbox - Lightbox

 
IMG_8227_spreader.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8227_spreader
Add to Lightbox - Lightbox

Media Per Page