Global Warming Images
 

 
IMG_2093_p.jpg A yacht with a small wind turbine in front of the construction site for Dong Energy's offshore wind turbines. The yellow towers are the foundations for the offshore wind turbines of the Walney wind farm.
 
IMG_2093_p
Add to Lightbox - Lightbox

 
IMG_2096_p.jpg A yacht with a small wind turbine in front of the construction site for Dong Energy's offshore wind turbines. The yellow towers are the foundations for the offshore wind turbines of the Walney wind farm.
 
IMG_2096_p
Add to Lightbox - Lightbox

 
IMG_2101_p.jpg A yacht with a small wind turbine in front of the construction site for Dong Energy's offshore wind turbines. The yellow towers are the foundations for the offshore wind turbines of the Walney wind farm.
 
IMG_2101_p
Add to Lightbox - Lightbox

 
IMG_2115_docks.jpg Manufacturing the foundations for off shore wind turbines, at Dong Energy's site in BArrow in Furness, Cumbria, UK. The turbines are for the Walney wind farm, about 15km off Barrow in the Irish Sea.
 
IMG_2115_docks
Add to Lightbox - Lightbox

 
IMG_2120_port.jpg Manufacturing the foundations for off shore wind turbines, at Dong Energy's site in BArrow in Furness, Cumbria, UK. The turbines are for the Walney wind farm, about 15km off Barrow in the Irish Sea.
 
IMG_2120_port
Add to Lightbox - Lightbox

 
IMG_2133_sign.jpg Manufacturing the foundations for off shore wind turbines, at Dong Energy's site in BArrow in Furness, Cumbria, UK. The turbines are for the Walney wind farm, about 15km off Barrow in the Irish Sea.
 
IMG_2133_sign
Add to Lightbox - Lightbox

 
IMG_3341_support.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3341_support
Add to Lightbox - Lightbox

 
IMG_3344_man.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3344_man
Add to Lightbox - Lightbox

 
IMG_3347_yard.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3347_yard
Add to Lightbox - Lightbox

 
IMG_3348_grey.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3348_grey
Add to Lightbox - Lightbox

 
IMG_3353_tower.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3353_tower
Add to Lightbox - Lightbox

 
IMG_3359_protection.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3359_protection
Add to Lightbox - Lightbox

 
IMG_3366_Mostyn port.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3366_Mostyn port
Add to Lightbox - Lightbox

 
IMG_3500_crate.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3500_crate
Add to Lightbox - Lightbox

 
IMG_3501_scale.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3501_scale
Add to Lightbox - Lightbox

 
IMG_3509_blades.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3509_blades
Add to Lightbox - Lightbox

 
IMG_3531_mostyn.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3531_mostyn
Add to Lightbox - Lightbox

 
IMG_4302_supplies.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4302_supplies
Add to Lightbox - Lightbox

 
IMG_4379_yard.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4379_yard
Add to Lightbox - Lightbox

 
IMG_4388_covering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4388_covering
Add to Lightbox - Lightbox

 
IMG_4392_cover.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4392_cover
Add to Lightbox - Lightbox

 
IMG_4414_mostyn.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4414_mostyn
Add to Lightbox - Lightbox

 
IMG_4416_covering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4416_covering
Add to Lightbox - Lightbox

 
IMG_4420_high vis.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4420_high vis
Add to Lightbox - Lightbox

 
IMG_4421_storage.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4421_storage
Add to Lightbox - Lightbox

 
IMG_4426_circle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4426_circle
Add to Lightbox - Lightbox

 
IMG_4427_Mostyn.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4427_Mostyn
Add to Lightbox - Lightbox

 
IMG_4428_nacelle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4428_nacelle
Add to Lightbox - Lightbox

 
IMG_4433_nacelles.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4433_nacelles
Add to Lightbox - Lightbox

 
IMG_4446_doorway.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site. This shot shows an enginner standing in the entrance to one of the turbine towers.
 
IMG_4446_doorway
Add to Lightbox - Lightbox

 
IMG_3341_turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3341_turbine
Add to Lightbox - Lightbox

 
IMG_3344_.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3344_
Add to Lightbox - Lightbox

Media Per Page