Global Warming Images
 

 
IMG_8317_hopper.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8317_hopper
Add to Lightbox - Lightbox

 
IMG_8319_walkway.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8319_walkway
Add to Lightbox - Lightbox

 
IMG_8322_join.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8322_join
Add to Lightbox - Lightbox

 
IMG_8323_dusty.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8323_dusty
Add to Lightbox - Lightbox

 
IMG_8325_rusting.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8325_rusting
Add to Lightbox - Lightbox

 
IMG_8331_mixer.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8331_mixer
Add to Lightbox - Lightbox

 
IMG_8335_bag.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8335_bag
Add to Lightbox - Lightbox

 
IMG_8336_harness.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8336_harness
Add to Lightbox - Lightbox

 
IMG_8337_green job.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8337_green job
Add to Lightbox - Lightbox

 
IMG_8341_container.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8341_container
Add to Lightbox - Lightbox

 
IMG_8342_railing.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8342_railing
Add to Lightbox - Lightbox

 
IMG_8345_steel.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8345_steel
Add to Lightbox - Lightbox

 
IMG_8347_tube.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8347_tube
Add to Lightbox - Lightbox

 
IMG_8349_monopile.jpg The jack up barge, The Goliath moored next to a monopile at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. The Goliath will then fit a transition pice over the monopile, upon which the wind turbine is constructed. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8349_monopile
Add to Lightbox - Lightbox

 
IMG_8350_gesture.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8350_gesture
Add to Lightbox - Lightbox

 
IMG_8352_protective suit.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8352_protective suit
Add to Lightbox - Lightbox

 
IMG_8355_protective clothing.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8355_protective clothing
Add to Lightbox - Lightbox

 
IMG_8360_cement mixer.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8360_cement mixer
Add to Lightbox - Lightbox

 
IMG_8368_mixer.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8368_mixer
Add to Lightbox - Lightbox

 
IMG_8371_grout.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8371_grout
Add to Lightbox - Lightbox

 
IMG_8384_lifting.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8384_lifting
Add to Lightbox - Lightbox

 
IMG_8387_hole.jpg A worker stands on top of a 320 tonne transition piece on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8387_hole
Add to Lightbox - Lightbox

 
IMG_8388_crane operator.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8388_crane operator
Add to Lightbox - Lightbox

 
IMG_8393_cement.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8393_cement
Add to Lightbox - Lightbox

 
IMG_8395_bag.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8395_bag
Add to Lightbox - Lightbox

 
IMG_8396_sitting.jpg A worker on top of a 320 tonne transition piece on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8396_sitting
Add to Lightbox - Lightbox

 
IMG_8398_red.jpg A worker on top of a 320 tonne transition piece on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8398_red
Add to Lightbox - Lightbox

 
IMG_8400_cement.jpg Workers prepare a specialist grout to cement a transition piece onto a monopile on the jack up barge,  Goliath  on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8400_cement
Add to Lightbox - Lightbox

 
IMG_8403_circle.jpg A worker on top of a 320 tonne transition piece on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8403_circle
Add to Lightbox - Lightbox

 
IMG_8509_helmet.jpg A monopile, the foundation for a wind turbine, on the Walney offshore wind farm. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8509_helmet
Add to Lightbox - Lightbox

 
IMG_8521_rusty.jpg A monopile, the foundation for a wind turbine, on the Walney offshore wind farm. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8521_rusty
Add to Lightbox - Lightbox

 
IMG_8523_weight.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8523_weight
Add to Lightbox - Lightbox

Media Per Page