Global Warming Images
 

 
20060601_366W2115.jpg A house at night with a moon in Ambleside UK
 
20060601_366W2115
Add to Lightbox - Lightbox

 
IMG_9705_night time.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.
 
IMG_9705_night time
Add to Lightbox - Lightbox

 
IMG_7704_harbour side.jpg The jack up barge, The Goliath loading up with transition pieces for  the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7704_harbour side
Add to Lightbox - Lightbox

 
IMG_7720_port.jpg The jack up barge, The Goliath loading up with transition pieces for  the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7720_port
Add to Lightbox - Lightbox

 
IMG_7734_seat.jpg A Frog, personel transfer device on the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7734_seat
Add to Lightbox - Lightbox

 
IMG_7736_frog.jpg A Frog, personel transfer device on the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7736_frog
Add to Lightbox - Lightbox

 
IMG_7772_container.jpg A tug boat towing a jack up barge, the Goliath, out to work on the Walney offshore wind farm off south Cumbria, UK.
 
IMG_7772_container
Add to Lightbox - Lightbox

 
IMG_7777_snug fit.jpg A tug boat towing a jack up barge, the Goliath, out to work on the Walney offshore wind farm off south Cumbria, UK.
 
IMG_7777_snug fit
Add to Lightbox - Lightbox

 
IMG_7782_harbour gates.jpg A tug boat towing a jack up barge, the Goliath, out to work on the Walney offshore wind farm off south Cumbria, UK.
 
IMG_7782_harbour gates
Add to Lightbox - Lightbox

 
IMG_8085_night time.jpg The jack up barge, The Goliath prepares to lift a transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8085_night time
Add to Lightbox - Lightbox

 
IMG_8086_decking.jpg The jack up barge, The Goliath prepares to lift a transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8086_decking
Add to Lightbox - Lightbox

 
IMG_8103_space.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8103_space
Add to Lightbox - Lightbox

 
IMG_8112_wire.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8112_wire
Add to Lightbox - Lightbox

 
IMG_8129_dawn shift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8129_dawn shift
Add to Lightbox - Lightbox

 
IMG_8131_night shift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8131_night shift
Add to Lightbox - Lightbox

 
IMG_8134_sky.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8134_sky
Add to Lightbox - Lightbox

 
IMG_8139_night shift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8139_night shift
Add to Lightbox - Lightbox

 
IMG_8142_night work.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8142_night work
Add to Lightbox - Lightbox

 
IMG_8147_night lift.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8147_night lift
Add to Lightbox - Lightbox

 
IMG_8148_gloaming.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8148_gloaming
Add to Lightbox - Lightbox

 
IMG_8154_deck.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8154_deck
Add to Lightbox - Lightbox

 
IMG_8183_unbolt.jpg Workers next to a 320 tonne transition piece on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8183_unbolt
Add to Lightbox - Lightbox

 
IMG_8194_wire.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8194_wire
Add to Lightbox - Lightbox

 
IMG_8197_night shift.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8197_night shift
Add to Lightbox - Lightbox

 
IMG_8203_crane hook.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8203_crane hook
Add to Lightbox - Lightbox

 
IMG_8211_workmen.jpg Workers next to a crane hook on the deck of the jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8211_workmen
Add to Lightbox - Lightbox

 
IMG_8217_dawn.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8217_dawn
Add to Lightbox - Lightbox

 
IMG_8227_spreader.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8227_spreader
Add to Lightbox - Lightbox

 
IMG_8230_night.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8230_night
Add to Lightbox - Lightbox

 
IMG_8240_yellow.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8240_yellow
Add to Lightbox - Lightbox

 
IMG_8246_gantry.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8246_gantry
Add to Lightbox - Lightbox

 
IMG_8252_link.jpg The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_8252_link
Add to Lightbox - Lightbox

Media Per Page