Global Warming Images
 

 
IMG_2701_tug.jpg A tug prepares to move a Pelamis P2 wave energy generation device to its test site off Orkney, Scotland, UK.
 
IMG_2701_tug
Add to Lightbox - Lightbox

 
IMG_7168_p.jpg A spill kit at a geothermal energy project by Newcastle University, funded by the Dept of Energy and Climate Change. This project involves drilling 6,000 feet beneath Newcastle, on the site of the old Newcastle Brown Brewery. At this depth, the geothermally heated water is 80 degrees C. The plan is for this renewable energy source to provide space heating for a shopping centre and University buildings.
 
IMG_7168_p
Add to Lightbox - Lightbox

 
IMG_7171_p.jpg A spill kit at a geothermal energy project by Newcastle University, funded by the Dept of Energy and Climate Change. This project involves drilling 6,000 feet beneath Newcastle, on the site of the old Newcastle Brown Brewery. At this depth, the geothermally heated water is 80 degrees C. The plan is for this renewable energy source to provide space heating for a shopping centre and University buildings.
 
IMG_7171_p
Add to Lightbox - Lightbox

 
IMG_7175_p.jpg A spill kit at a geothermal energy project by Newcastle University, funded by the Dept of Energy and Climate Change. This project involves drilling 6,000 feet beneath Newcastle, on the site of the old Newcastle Brown Brewery. At this depth, the geothermally heated water is 80 degrees C. The plan is for this renewable energy source to provide space heating for a shopping centre and University buildings.
 
IMG_7175_p
Add to Lightbox - Lightbox

 
IMG_7179_p.jpg A spill kit at a geothermal energy project by Newcastle University, funded by the Dept of Energy and Climate Change. This project involves drilling 6,000 feet beneath Newcastle, on the site of the old Newcastle Brown Brewery. At this depth, the geothermally heated water is 80 degrees C. The plan is for this renewable energy source to provide space heating for a shopping centre and University buildings.
 
IMG_7179_p
Add to Lightbox - Lightbox

 
IMG_1375_step ladder.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a nacelle being prepared to lift.
 
IMG_1375_step ladder
Add to Lightbox - Lightbox

 
IMG_1381_stepladder.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a nacelle being prepared to lift.
 
IMG_1381_stepladder
Add to Lightbox - Lightbox

 
IMG_1498_yard.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows blades being prepared to be lifted.
 
IMG_1498_yard
Add to Lightbox - Lightbox

 
IMG_1501_tractor.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows blades being prepared to be lifted.
 
IMG_1501_tractor
Add to Lightbox - Lightbox

 
IMG_9401_woman.jpg An engineer prepares to climb a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9401_woman
Add to Lightbox - Lightbox

 
IMG_9404_engineer.jpg An engineer prepares to climb a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9404_engineer
Add to Lightbox - Lightbox

 
IMG_9407_help.jpg An engineer prepares to climb a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9407_help
Add to Lightbox - Lightbox

 
IMG_9408_prepare.jpg An engineer prepares to climb a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9408_prepare
Add to Lightbox - Lightbox

 
IMG_9409_engineer.jpg An engineer prepares to climb a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9409_engineer
Add to Lightbox - Lightbox

 
IMG_9487_offshore.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9487_offshore
Add to Lightbox - Lightbox

 
IMG_9489_offshore.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9489_offshore
Add to Lightbox - Lightbox

 
IMG_9491_crew transfer.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9491_crew transfer
Add to Lightbox - Lightbox

 
IMG_9494_crew transfer.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9494_crew transfer
Add to Lightbox - Lightbox

 
IMG_9495_crew transfer.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9495_crew transfer
Add to Lightbox - Lightbox

 
IMG_9497_crew transfer.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9497_crew transfer
Add to Lightbox - Lightbox

 
IMG_9501_life boat.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9501_life boat
Add to Lightbox - Lightbox

 
IMG_9503_construction.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9503_construction
Add to Lightbox - Lightbox

 
IMG_9507_red.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9507_red
Add to Lightbox - Lightbox

 
IMG_9510_jack up barge.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9510_jack up barge
Add to Lightbox - Lightbox

 
IMG_9511_transfer vessel.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9511_transfer vessel
Add to Lightbox - Lightbox

 
IMG_9513_transfer boat.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9513_transfer boat
Add to Lightbox - Lightbox

 
IMG_9515_transfer.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9515_transfer
Add to Lightbox - Lightbox

 
IMG_9518_jack up.jpg Crew on a crew transport vessel, prepare to transfer to a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9518_jack up
Add to Lightbox - Lightbox

 
IMG_9668_confined space.jpg Health and safety workers inside a turbine, prepare to climb up into the nacelle, at the Walney offshore wind farm which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9668_confined space
Add to Lightbox - Lightbox

 
IMG_9670_nacelle.jpg Health and safety workers inside a turbine, prepare to climb up into the nacelle, at the Walney offshore wind farm which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9670_nacelle
Add to Lightbox - Lightbox

 
IMG_9672_hub.jpg Health and safety workers inside a turbine, prepare to climb up into the nacelle, at the Walney offshore wind farm which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9672_hub
Add to Lightbox - Lightbox

 
IMG_9850_colleague.jpg A Health and safety worker inside a turbine, prepares to descend from the nacelle, at the Walney offshore wind farm which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9850_colleague
Add to Lightbox - Lightbox

Media Per Page