Global Warming Images
 

 
IMG_1625_p.jpg A geothermal energy project by Newcastle University, funded by the Dept of Energy and Climate Change. This project involves drilling 6,000 feet beneath Newcastle, on the site of the old Newcastle Brown Brewery. At this depth, the geothermally heated water is 80 degrees C. The plan is for this renewable energy source to provide space heating for a shopping centre and University buildings.
 
IMG_1625_p
Add to Lightbox - Lightbox

 
IMG_2274_wind.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2274_wind
Add to Lightbox - Lightbox

 
IMG_2325_crew.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2325_crew
Add to Lightbox - Lightbox

 
IMG_2331_helmet.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2331_helmet
Add to Lightbox - Lightbox

 
IMG_8422_dong.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8422_dong
Add to Lightbox - Lightbox

 
IMG_0401_fire.jpg A fire fighting exercise as part of a BOSIET course for offshore workers, who have to undergo the safety instruction and pass the course, before being allowed offshore. This shot shows a foam extinguisher being used to put out a blaze.
 
IMG_0401_fire
Add to Lightbox - Lightbox

 
IMG_2263_mooring.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2263_mooring
Add to Lightbox - Lightbox

 
IMG_2270_ships crew.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2270_ships crew
Add to Lightbox - Lightbox

 
IMG_2274_transporter ship.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2274_transporter ship
Add to Lightbox - Lightbox

 
IMG_2275_red.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2275_red
Add to Lightbox - Lightbox

 
IMG_2285_transporter.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2285_transporter
Add to Lightbox - Lightbox

 
IMG_2319_ships crew.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2319_ships crew
Add to Lightbox - Lightbox

 
IMG_2325_green economy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2325_green economy
Add to Lightbox - Lightbox

 
IMG_2327_high vis.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2327_high vis
Add to Lightbox - Lightbox

 
IMG_2331_health and safety.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2331_health and safety
Add to Lightbox - Lightbox

 
IMG_2381_embarcation.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2381_embarcation
Add to Lightbox - Lightbox

 
IMG_2383_prow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2383_prow
Add to Lightbox - Lightbox

 
IMG_2385_men.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2385_men
Add to Lightbox - Lightbox

 
IMG_2390_green economy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2390_green economy
Add to Lightbox - Lightbox

 
IMG_2395_green jobs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2395_green jobs
Add to Lightbox - Lightbox

 
IMG_2419_green economy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2419_green economy
Add to Lightbox - Lightbox

 
IMG_4056_PPE.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows Dong employees training to work at height, below the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4056_PPE
Add to Lightbox - Lightbox

 
IMG_8416_high vis.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8416_high vis
Add to Lightbox - Lightbox

 
IMG_8422_sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8422_sea
Add to Lightbox - Lightbox

 
IMG_8425_high vis.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8425_high vis
Add to Lightbox - Lightbox

 
IMG_8429_green employment.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8429_green employment
Add to Lightbox - Lightbox

 
IMG_8459_hair.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transfer, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8459_hair
Add to Lightbox - Lightbox

 
IMG_8561_green jobs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transfer, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8561_green jobs
Add to Lightbox - Lightbox

 
IMG_8582_supply ship.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8582_supply ship
Add to Lightbox - Lightbox

 
IMG_8590_support vessel.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_8590_support vessel
Add to Lightbox - Lightbox

 
IMG_1625_green jobs.jpg A geothermal energy project by Newcastle University, funded by the Dept of Energy and Climate Change. This project involves drilling 6,000 feet beneath Newcastle, on the site of the old Newcastle Brown Brewery. At this depth, the geothermally heated water is 80 degrees C. The plan is for this renewable energy source to provide space heating for a shopping centre and University buildings.
 
IMG_1625_green jobs
Add to Lightbox - Lightbox

 
IMG_0025_cost.jpg Resurfacing work taking place in Ambleside after floods and harsh winter weather caused serious erosion of the road surface leading to many potholes.
 
IMG_0025_cost
Add to Lightbox - Lightbox

Media Per Page