Global Warming Images
 

 
IMG_2514_cranes.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_2514_cranes
Add to Lightbox - Lightbox

 
IMG_2526_caterpiller.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_2526_caterpiller
Add to Lightbox - Lightbox

 
IMG_2528_barrow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_2528_barrow
Add to Lightbox - Lightbox

 
IMG_2533_workforce.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_2533_workforce
Add to Lightbox - Lightbox

 
IMG_2739_barge.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2739_barge
Add to Lightbox - Lightbox

 
IMG_2742_grey.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2742_grey
Add to Lightbox - Lightbox

 
IMG_2746_calm.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2746_calm
Add to Lightbox - Lightbox

 
IMG_2752_sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2752_sea
Add to Lightbox - Lightbox

 
IMG_2760_precision.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2760_precision
Add to Lightbox - Lightbox

 
IMG_2764_yellow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2764_yellow
Add to Lightbox - Lightbox

 
IMG_2766_fitting.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2766_fitting
Add to Lightbox - Lightbox

 
IMG_2781_construction.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2781_construction
Add to Lightbox - Lightbox

 
IMG_2813_green.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2813_green
Add to Lightbox - Lightbox

 
IMG_2816_goliath.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_2816_goliath
Add to Lightbox - Lightbox

 
IMG_3965_rescue.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the jack up barge that hammers the monopiles into the sea bed  and here is fitting a transition piece onto the top of the monopile.
 
IMG_3965_rescue
Add to Lightbox - Lightbox

 
IMG_3971_docks.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_3971_docks
Add to Lightbox - Lightbox

 
IMG_3980_arch.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_3980_arch
Add to Lightbox - Lightbox

 
IMG_3988_visible.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_3988_visible
Add to Lightbox - Lightbox

 
IMG_3994_sky.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_3994_sky
Add to Lightbox - Lightbox

 
IMG_3998_yellow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_3998_yellow
Add to Lightbox - Lightbox

 
IMG_4007_tall.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4007_tall
Add to Lightbox - Lightbox

 
IMG_4011_perspective.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4011_perspective
Add to Lightbox - Lightbox

 
IMG_4016_massive.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4016_massive
Add to Lightbox - Lightbox

 
IMG_4019_Dong.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4019_Dong
Add to Lightbox - Lightbox

 
IMG_4022_dong.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4022_dong
Add to Lightbox - Lightbox

 
IMG_4056_group.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows Dong employees training to work at height, below the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4056_group
Add to Lightbox - Lightbox

 
IMG_4056_PPE.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows Dong employees training to work at height, below the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_4056_PPE
Add to Lightbox - Lightbox

 
IMG_8387_jack up barge.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_8387_jack up barge
Add to Lightbox - Lightbox

 
IMG_8592_Barrow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_8592_Barrow
Add to Lightbox - Lightbox

 
IMG_8593_welding.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_8593_welding
Add to Lightbox - Lightbox

 
IMG_8605_transition.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_8605_transition
Add to Lightbox - Lightbox

 
IMG_8608_engineering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_8608_engineering
Add to Lightbox - Lightbox

Media Per Page