Global Warming Images
 

 
IMG_2029_refuelling.jpg An offshore vessel is refuelled with marine diesel.
 
IMG_2029_refuelling
Add to Lightbox - Lightbox

 
IMG_9437_skipper.jpg The skipper of a crew transfer vessel at the Walney offshore wind farm, the farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9437_skipper
Add to Lightbox - Lightbox

 
IMG_9438_skipper.jpg The skipper of a crew transfer vessel at the Walney offshore wind farm, the farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9438_skipper
Add to Lightbox - Lightbox

 
IMG_8206_skipper.jpg The captain of the Jack up barge, the Goliath controling the ship, in the control room.
 
IMG_8206_skipper
Add to Lightbox - Lightbox

 
IMG_8212_control panel.jpg The captain of the jack up barge, Goliath at the controls on the bridge.
 
IMG_8212_control panel
Add to Lightbox - Lightbox

 
IMG_8220_captain.jpg The captain of the jack up barge, Goliath at the controls on the bridge.
 
IMG_8220_captain
Add to Lightbox - Lightbox

 
IMG_3872_skipper.jpg The bridge of the offshore support vessel being used by Dong Energy to ferry staff out to the offshore wind farm, Barrow in Furness, Cumbria, UK.
 
IMG_3872_skipper
Add to Lightbox - Lightbox

 
IMG_7126_transfer boat.jpg A offshore supply vessel working on the Walney offshore wind farm, Cumbria, UK.
 
IMG_7126_transfer boat
Add to Lightbox - Lightbox

 
IMG_7128_marine transfer.jpg A offshore supply vessel working on the Walney offshore wind farm, Cumbria, UK.
 
IMG_7128_marine transfer
Add to Lightbox - Lightbox

 
IMG_2427_skipper.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2427_skipper
Add to Lightbox - Lightbox

 
IMG_3872_captain.jpg The bridge of the offshore support vessel being used by Dong Energy to ferry staff out to the offshore wind farm, Barrow in Furness, Cumbria, UK.
 
IMG_3872_captain
Add to Lightbox - Lightbox

Media Per Page