Global Warming Images
 

 
IMG_7803_span.jpg The jack up barge, The Goliath at the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7803_span
Add to Lightbox - Lightbox

 
IMG_9602_tanker.jpg This Thomas Armstrong lorry (a local haulage contractor) was the first to cross the new Workington bridge, from the north side over the River Derwent, during the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9602_tanker
Add to Lightbox - Lightbox

 
IMG_9603_haulage.jpg This Thomas Armstrong lorry (a local haulage contractor) was the first to cross the new Workington bridge, from the north side over the River Derwent, during the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9603_haulage
Add to Lightbox - Lightbox

 
IMG_9604_lorry.jpg This Thomas Armstrong lorry (a local haulage contractor) was the first to cross the new Workington bridge, from the north side over the River Derwent, during the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9604_lorry
Add to Lightbox - Lightbox

 
IMG_8616_bridge opening.jpg The Chief Executive of Cumbria County Council stands on the new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_8616_bridge opening
Add to Lightbox - Lightbox

 
IMG_8618_bridge opening.jpg Cumbria County Council official contractor representetive stand on the new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_8618_bridge opening
Add to Lightbox - Lightbox

 
IMG_8621_priest.jpg The blessing of the new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_8621_priest
Add to Lightbox - Lightbox

 
IMG_8640_contractors.jpg Contractors stand on the new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_8640_contractors
Add to Lightbox - Lightbox

 
IMG_8648_river crossing.jpg This Eddie Stobart lorry was chosen as the first vehicle to cross the new Workington bridge crossing the River Derwent, at the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
The very first vehicle to cross the bridge when the tape was cut during the opening ceremony.
 
IMG_8648_river crossing
Add to Lightbox - Lightbox

 
IMG_9530_cumbria county council.jpg The new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9530_cumbria county council
Add to Lightbox - Lightbox

 
IMG_9532_bridge.jpg The new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9532_bridge
Add to Lightbox - Lightbox

 
IMG_9563_reconstruction.jpg The new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9563_reconstruction
Add to Lightbox - Lightbox

 
IMG_9583_workington.jpg The new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9583_workington
Add to Lightbox - Lightbox

 
IMG_9584_opening ceremony.jpg The new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9584_opening ceremony
Add to Lightbox - Lightbox

 
IMG_9594_bus.jpg The first bus to cross the new Workington bridge crossing the River Derwent, shortly before the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9594_bus
Add to Lightbox - Lightbox

 
IMG_9601_haulage.jpg This Thomas Armstrong lorry (a local haulage contractor) was the first to cross the new Workington bridge, from the north side over the River Derwent, during the official opening. The bridge links the two halves of Workington to motor traffic for the first time in 5 months, since the devastating November 2009 floods.
 
IMG_9601_haulage
Add to Lightbox - Lightbox

 
IMG_7569_river Leven.jpg Newby Bridge in Cumbria, UK.
 
IMG_7569_river Leven
Add to Lightbox - Lightbox

 
IMG_0089_turbulent.jpg Meltwater from the Russell Galcier that drains the Greenland Ice Sheet 26 km inland from Kangerlussuaq. Like most Greenland glaciers it is both receeding and speeding up as a result of global warming and the rivers that drain them are becoming more swollen by greater quantities of melt water
 
IMG_0089_turbulent
Add to Lightbox - Lightbox

Media Per Page