Global Warming Images
 

 
IMG_2435_support vessel.jpg The EMEC centre's test site of Billia Croo in Stromness, Orkney, Scotland, UK. The European Marine Energy Centre is the only accredited wave and tidal energy test centre for marine renewable energy in the world. This shot shows a boat putting divers in the water for works on the tidal energy devices
 
IMG_2435_support vessel
Add to Lightbox - Lightbox

 
IMG_2274_wind.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2274_wind
Add to Lightbox - Lightbox

 
IMG_2287_energy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2287_energy
Add to Lightbox - Lightbox

 
IMG_2325_crew.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2325_crew
Add to Lightbox - Lightbox

 
IMG_2331_helmet.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the Wind Transporter, a brand new support vessel that is used to transport workers to the offshore wind farm construction site.
 
IMG_2331_helmet
Add to Lightbox - Lightbox

 
IMG_3872_skipper.jpg The bridge of the offshore support vessel being used by Dong Energy to ferry staff out to the offshore wind farm, Barrow in Furness, Cumbria, UK.
 
IMG_3872_skipper
Add to Lightbox - Lightbox

 
IMG_3884_controls.jpg The bridge of the offshore support vessel being used by Dong Energy to ferry staff out to the offshore wind farm, Barrow in Furness, Cumbria, UK.
 
IMG_3884_controls
Add to Lightbox - Lightbox

 
IMG_4339_offshore.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4339_offshore
Add to Lightbox - Lightbox

 
IMG_4342_marine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4342_marine
Add to Lightbox - Lightbox

 
IMG_4344_contractor.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4344_contractor
Add to Lightbox - Lightbox

 
IMG_4351_Dong.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4351_Dong
Add to Lightbox - Lightbox

 
IMG_4352_wave.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4352_wave
Add to Lightbox - Lightbox

 
IMG_4370_sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4370_sea
Add to Lightbox - Lightbox

 
IMG_4374_shipping.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4374_shipping
Add to Lightbox - Lightbox

 
IMG_4376_prow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4376_prow
Add to Lightbox - Lightbox

 
IMG_4389_life jacket.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_4389_life jacket
Add to Lightbox - Lightbox

 
IMG_4415_view.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_4415_view
Add to Lightbox - Lightbox

 
IMG_4418_legs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4418_legs
Add to Lightbox - Lightbox

 
IMG_4423_deck.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as a gas platform from the Morecambe Bay gas field in the back ground.
 
IMG_4423_deck
Add to Lightbox - Lightbox

 
IMG_4428 (1)_cloud.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_4428 (1)_cloud
Add to Lightbox - Lightbox

 
IMG_4439_shipping.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4439_shipping
Add to Lightbox - Lightbox

 
IMG_4441_crane.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4441_crane
Add to Lightbox - Lightbox

 
IMG_4443_cable laying.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4443_cable laying
Add to Lightbox - Lightbox

 
IMG_4452_electricity.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4452_electricity
Add to Lightbox - Lightbox

 
IMG_4463_boats.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4463_boats
Add to Lightbox - Lightbox

 
IMG_4466_red.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4466_red
Add to Lightbox - Lightbox

 
IMG_4540_ship.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4540_ship
Add to Lightbox - Lightbox

 
IMG_4566_docking.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4566_docking
Add to Lightbox - Lightbox

 
IMG_4582_vessel.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4582_vessel
Add to Lightbox - Lightbox

 
IMG_4585_light.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4585_light
Add to Lightbox - Lightbox

 
IMG_4624_cloudy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as a gas platform from the Morecambe Bay gas field in the back ground.
 
IMG_4624_cloudy
Add to Lightbox - Lightbox

 
IMG_4734_sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4734_sea
Add to Lightbox - Lightbox

Media Per Page