Global Warming Images
 

 
IMG_1491_glow.jpg Herring and Lesser Black Backed Gulls on the beach at Blackpool, Lancashire, UK at sunset.
 
IMG_1491_glow
Add to Lightbox - Lightbox

 
IMG_1492_shore.jpg Herring and Lesser Black Backed Gulls on the beach at Blackpool, Lancashire, UK at sunset.
 
IMG_1492_shore
Add to Lightbox - Lightbox

 
IMG_3262_p.jpg The area of the North Wales coast between Prestatyn and Abergele was reclaimed from an ancient salt marsh. As such it is flat, low lying and susceptible to coastal flooding. Climate change driven sea level rise increases the risk making it one of the most at risk coastal areas in the British Isles. In 1990 a combination of strong westerly winds a high tide and a 1.5m storm surge breached 400 metres of the sea wall and inundated 2800 properties in Towyn and Kinmel Bay. The rocks have been placed to try and strengthen the sea wall.
 
IMG_3262_p
Add to Lightbox - Lightbox

 
IMG_3272_p.jpg The area of the North Wales coast between Prestatyn and Abergele was reclaimed from an ancient salt marsh. As such it is flat, low lying and susceptible to coastal flooding. Climate change driven sea level rise increases the risk making it one of the most at risk coastal areas in the British Isles. In 1990 a combination of strong westerly winds a high tide and a 1.5m storm surge breached 400 metres of the sea wall and inundated 2800 properties in Towyn and Kinmel Bay. The rocks have been placed to try and strengthen the sea wall.
 
IMG_3272_p
Add to Lightbox - Lightbox

 
IMG_3275_p.jpg The area of the North Wales coast between Prestatyn and Abergele was reclaimed from an ancient salt marsh. As such it is flat, low lying and susceptible to coastal flooding. Climate change driven sea level rise increases the risk making it one of the most at risk coastal areas in the British Isles. In 1990 a combination of strong westerly winds a high tide and a 1.5m storm surge breached 400 metres of the sea wall and inundated 2800 properties in Towyn and Kinmel Bay. The rocks have been placed to try and strengthen the sea wall.
 
IMG_3275_p
Add to Lightbox - Lightbox

 
IMG_3280_p.jpg The area of the North Wales coast between Prestatyn and Abergele was reclaimed from an ancient salt marsh. As such it is flat, low lying and susceptible to coastal flooding. Climate change driven sea level rise increases the risk making it one of the most at risk coastal areas in the British Isles. In 1990 a combination of strong westerly winds a high tide and a 1.5m storm surge breached 400 metres of the sea wall and inundated 2800 properties in Towyn and Kinmel Bay. The rocks have been placed to try and strengthen the sea wall.
 
IMG_3280_p
Add to Lightbox - Lightbox

 
IMG_3283_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3283_p
Add to Lightbox - Lightbox

 
IMG_3285_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3285_p
Add to Lightbox - Lightbox

 
IMG_3289_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3289_p
Add to Lightbox - Lightbox

 
IMG_3291_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3291_p
Add to Lightbox - Lightbox

 
IMG_3293_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3293_p
Add to Lightbox - Lightbox

 
IMG_3296_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3296_p
Add to Lightbox - Lightbox

 
IMG_3297 (1)_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3297 (1)_p
Add to Lightbox - Lightbox

 
IMG_3299_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3299_p
Add to Lightbox - Lightbox

 
IMG_3308_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3308_p
Add to Lightbox - Lightbox

 
IMG_3310_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3310_p
Add to Lightbox - Lightbox

 
IMG_3312_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3312_p
Add to Lightbox - Lightbox

 
IMG_3316_p.jpg The Rhyl Flats offshore wind farm is situated about 7 Km off the North Wales coast, in Liverpool bay, between Prestatyn and Rhyl. It consists of 25 turbines, and has a total capacity of 90 MW, enough to power 60,000 homes annualy.
 
IMG_3316_p
Add to Lightbox - Lightbox

 
IMG_1161_arrival.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, with the jack up barge, Krakken arriving at night.
 
IMG_1161_arrival
Add to Lightbox - Lightbox

 
IMG_1167_quay.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1167_quay
Add to Lightbox - Lightbox

 
IMG_1171_floodlit.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1171_floodlit
Add to Lightbox - Lightbox

 
IMG_1178_cover.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1178_cover
Add to Lightbox - Lightbox

 
IMG_1180_screw thread.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1180_screw thread
Add to Lightbox - Lightbox

 
IMG_1183_blur.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1183_blur
Add to Lightbox - Lightbox

 
IMG_1184_night shift.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge being loaded at night.
 
IMG_1184_night shift
Add to Lightbox - Lightbox

 
IMG_1187_reflection.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge at dawn, reflected in a puddle.
 
IMG_1187_reflection
Add to Lightbox - Lightbox

 
IMG_1188_puddle.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge at dawn, reflected in a puddle.
 
IMG_1188_puddle
Add to Lightbox - Lightbox

 
IMG_1189_dwan.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge at dawn, reflected in a puddle.
 
IMG_1189_dwan
Add to Lightbox - Lightbox

 
IMG_1196_sunrise.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge at dawn, reflected in a puddle.
 
IMG_1196_sunrise
Add to Lightbox - Lightbox

 
IMG_1201_dawn.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge at dawn, reflected in a puddle.
 
IMG_1201_dawn
Add to Lightbox - Lightbox

 
IMG_1202_frame.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge, the Krakken.
 
IMG_1202_frame
Add to Lightbox - Lightbox

 
IMG_1208_steel work.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge, the Krakken.
 
IMG_1208_steel work
Add to Lightbox - Lightbox

Media Per Page