Global Warming Images
 

 
IMG_6665_torrential rain.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_6665_torrential rain
Add to Lightbox - Lightbox

 
IMG_6674_ppe.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_6674_ppe
Add to Lightbox - Lightbox

 
IMG_6676_PPE.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_6676_PPE
Add to Lightbox - Lightbox

 
IMG_7132_dock side.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7132_dock side
Add to Lightbox - Lightbox

 
IMG_7136_jack up barge.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7136_jack up barge
Add to Lightbox - Lightbox

 
IMG_7137_tug.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7137_tug
Add to Lightbox - Lightbox

 
IMG_7142_ppe.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7142_ppe
Add to Lightbox - Lightbox

 
IMG_7144_crane.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7144_crane
Add to Lightbox - Lightbox

 
IMG_7149_tp.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7149_tp
Add to Lightbox - Lightbox

 
IMG_7152_crew.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7152_crew
Add to Lightbox - Lightbox

 
IMG_7157_massive.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7157_massive
Add to Lightbox - Lightbox

 
IMG_7161_deck hand.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7161_deck hand
Add to Lightbox - Lightbox

 
IMG_7166_transition piece.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7166_transition piece
Add to Lightbox - Lightbox

 
IMG_7167_goliath.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7167_goliath
Add to Lightbox - Lightbox

 
IMG_7176_green.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7176_green
Add to Lightbox - Lightbox

 
IMG_7178_jack up barge.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7178_jack up barge
Add to Lightbox - Lightbox

 
IMG_7179_power.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7179_power
Add to Lightbox - Lightbox

 
IMG_7183_tug boat.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7183_tug boat
Add to Lightbox - Lightbox

 
IMG_7186_tug.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7186_tug
Add to Lightbox - Lightbox

 
IMG_7190_tug.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7190_tug
Add to Lightbox - Lightbox

 
IMG_7198_transport.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7198_transport
Add to Lightbox - Lightbox

 
IMG_7206_dock gates.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7206_dock gates
Add to Lightbox - Lightbox

 
IMG_7208_crane.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7208_crane
Add to Lightbox - Lightbox

 
IMG_7209_jack up barge.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7209_jack up barge
Add to Lightbox - Lightbox

 
IMG_7212_jack up barge.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7212_jack up barge
Add to Lightbox - Lightbox

 
IMG_7214_barge.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7214_barge
Add to Lightbox - Lightbox

 
IMG_7217_barge.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7217_barge
Add to Lightbox - Lightbox

 
IMG_7220_tug boat.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7220_tug boat
Add to Lightbox - Lightbox

 
IMG_7225_docks.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7225_docks
Add to Lightbox - Lightbox

 
IMG_7227_marine transport.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7227_marine transport
Add to Lightbox - Lightbox

 
IMG_7229_Goliath.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7229_Goliath
Add to Lightbox - Lightbox

 
IMG_7234_transition piece.jpg The jack up barge, Goliath, loaded with transition pieces for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_7234_transition piece
Add to Lightbox - Lightbox

Media Per Page