Global Warming Images
 

 
IMG_0766_transformer.jpg A row of electric sockets.
 
IMG_0766_transformer
Add to Lightbox - Lightbox

 
IMG_2648_boat.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2648_boat
Add to Lightbox - Lightbox

 
IMG_2657_sub station.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2657_sub station
Add to Lightbox - Lightbox

 
IMG_2675_legs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2675_legs
Add to Lightbox - Lightbox

 
IMG_2688_electric.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2688_electric
Add to Lightbox - Lightbox

 
IMG_2693_sub station.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2693_sub station
Add to Lightbox - Lightbox

 
IMG_3897_legs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3897_legs
Add to Lightbox - Lightbox

 
IMG_3905_huge.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3905_huge
Add to Lightbox - Lightbox

 
IMG_3907_towering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3907_towering
Add to Lightbox - Lightbox

 
IMG_3923_camera.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3923_camera
Add to Lightbox - Lightbox

 
IMG_3925_crew.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3925_crew
Add to Lightbox - Lightbox

 
IMG_4339_offshore.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4339_offshore
Add to Lightbox - Lightbox

 
IMG_4342_marine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4342_marine
Add to Lightbox - Lightbox

 
IMG_4344_contractor.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4344_contractor
Add to Lightbox - Lightbox

 
IMG_4351_Dong.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4351_Dong
Add to Lightbox - Lightbox

 
IMG_4352_wave.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4352_wave
Add to Lightbox - Lightbox

 
IMG_4370_sea.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4370_sea
Add to Lightbox - Lightbox

 
IMG_4374_shipping.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4374_shipping
Add to Lightbox - Lightbox

 
IMG_4376_prow.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4376_prow
Add to Lightbox - Lightbox

 
IMG_4389_life jacket.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_4389_life jacket
Add to Lightbox - Lightbox

 
IMG_4415_view.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_4415_view
Add to Lightbox - Lightbox

 
IMG_4418_legs.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4418_legs
Add to Lightbox - Lightbox

 
IMG_4423_deck.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as a gas platform from the Morecambe Bay gas field in the back ground.
 
IMG_4423_deck
Add to Lightbox - Lightbox

 
IMG_4428 (1)_cloud.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_4428 (1)_cloud
Add to Lightbox - Lightbox

 
IMG_4439_shipping.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4439_shipping
Add to Lightbox - Lightbox

 
IMG_4441_crane.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4441_crane
Add to Lightbox - Lightbox

 
IMG_4443_cable laying.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4443_cable laying
Add to Lightbox - Lightbox

 
IMG_4452_electricity.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4452_electricity
Add to Lightbox - Lightbox

 
IMG_4463_boats.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4463_boats
Add to Lightbox - Lightbox

 
IMG_4466_red.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4466_red
Add to Lightbox - Lightbox

 
IMG_4486_building.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
 
IMG_4486_building
Add to Lightbox - Lightbox

 
IMG_4540_ship.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore, as well as offshore support and cable laying vessels.
 
IMG_4540_ship
Add to Lightbox - Lightbox

Media Per Page