Global Warming Images
 

 
20120121_IMG_4963.jpg An Audi convertible reflected in a puddle.
 
20120121_IMG_4963
Add to Lightbox - Lightbox

 
20120121_IMG_4965.jpg An Audi convertible reflected in a puddle.
 
20120121_IMG_4965
Add to Lightbox - Lightbox

 
20120121_IMG_4973.jpg An Audi convertible reflected in a puddle.
 
20120121_IMG_4973
Add to Lightbox - Lightbox

 
20120121_IMG_4976.jpg An Audi convertible reflected in a puddle.
 
20120121_IMG_4976
Add to Lightbox - Lightbox

 
IMG_1491_glow.jpg Herring and Lesser Black Backed Gulls on the beach at Blackpool, Lancashire, UK at sunset.
 
IMG_1491_glow
Add to Lightbox - Lightbox

 
IMG_1492_shore.jpg Herring and Lesser Black Backed Gulls on the beach at Blackpool, Lancashire, UK at sunset.
 
IMG_1492_shore
Add to Lightbox - Lightbox

 
IMG_2780_family.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2780_family
Add to Lightbox - Lightbox

 
IMG_2773_tracks.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2773_tracks
Add to Lightbox - Lightbox

 
IMG_2772_mud.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2772_mud
Add to Lightbox - Lightbox

 
IMG_2790_mud.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2790_mud
Add to Lightbox - Lightbox

 
IMG_2778_muddy field.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2778_muddy field
Add to Lightbox - Lightbox

 
IMG_2788_trampled.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2788_trampled
Add to Lightbox - Lightbox

 
IMG_2794_muddy.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2794_muddy
Add to Lightbox - Lightbox

 
IMG_2796_swamp.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2796_swamp
Add to Lightbox - Lightbox

 
IMG_2824_muddy.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2824_muddy
Add to Lightbox - Lightbox

 
IMG_2828_bag.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2828_bag
Add to Lightbox - Lightbox

 
IMG_2839_crop_quagmire.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2839_crop_quagmire
Add to Lightbox - Lightbox

 
IMG_2839_pink.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2839_pink
Add to Lightbox - Lightbox

 
IMG_2840_mud.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2840_mud
Add to Lightbox - Lightbox

 
IMG_2844_wellies.jpg A field churned up into Mud at the World Sheep Dog Trials at Lowther, Penrith, cumbria, UK, after months of wet weather over the summer. The 1st two days of the event were cancelled due to the conditions.
 
IMG_2844_wellies
Add to Lightbox - Lightbox

 
IMG_0999_boom.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_0999_boom
Add to Lightbox - Lightbox

 
IMG_1004_angle.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1004_angle
Add to Lightbox - Lightbox

 
IMG_1075_water.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1075_water
Add to Lightbox - Lightbox

 
IMG_1084_reflected.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1084_reflected
Add to Lightbox - Lightbox

 
IMG_1086_puddling.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1086_puddling
Add to Lightbox - Lightbox

 
IMG_1092_pooling.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1092_pooling
Add to Lightbox - Lightbox

 
IMG_1094_pool.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1094_pool
Add to Lightbox - Lightbox

 
IMG_1098_puddles.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1098_puddles
Add to Lightbox - Lightbox

 
IMG_1103_puddle.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1103_puddle
Add to Lightbox - Lightbox

 
IMG_1105_reflected.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1105_reflected
Add to Lightbox - Lightbox

 
IMG_1113_reflection.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1113_reflection
Add to Lightbox - Lightbox

 
IMG_1118_wet.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a consignment waiting on the dockside, reflected in a puddle.
 
IMG_1118_wet
Add to Lightbox - Lightbox

Media Per Page