Global Warming Images
 

 
IMG_3849_pelton wheel.jpg Pelton Wheels outside Dinorwig hydro power station visitor centre in Llanberis, Snowdonia, North Wales.
 
IMG_3849_pelton wheel
Add to Lightbox - Lightbox

 
IMG_9889_wheels.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a specialist low loader used to manouvre the heavy turbine pieces around.
 
IMG_9889_wheels
Add to Lightbox - Lightbox

 
IMG_4025_supplies.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4025_supplies
Add to Lightbox - Lightbox

 
IMG_4029_circle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4029_circle
Add to Lightbox - Lightbox

 
IMG_4032_low loader.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4032_low loader
Add to Lightbox - Lightbox

 
IMG_4035_piling.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4035_piling
Add to Lightbox - Lightbox

 
IMG_4038_foundation.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4038_foundation
Add to Lightbox - Lightbox

 
IMG_3849_HEP.jpg Pelton Wheels outside Dinorwig hydro power station visitor centre in Llanberis, Snowdonia, North Wales.
 
IMG_3849_HEP
Add to Lightbox - Lightbox

 
IMG_3850_pelton wheel.jpg Pelton Wheels outside Dinorwig hydro power station visitor centre in Llanberis, Snowdonia, North Wales.
 
IMG_3850_pelton wheel
Add to Lightbox - Lightbox

 
IMG_3019_low loader.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_3019_low loader
Add to Lightbox - Lightbox

 
IMG_4025_wind farm.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4025_wind farm
Add to Lightbox - Lightbox

 
IMG_4029_monopile.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4029_monopile
Add to Lightbox - Lightbox

 
IMG_4032_piling.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4032_piling
Add to Lightbox - Lightbox

 
IMG_4035_monopile.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4035_monopile
Add to Lightbox - Lightbox

 
IMG_4038_low loader.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the massive monopiles that are hammered 30 metres into the seabed to anchor the wind turbine.
 
IMG_4038_low loader
Add to Lightbox - Lightbox

 
IMG_2989_car crime.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_2989_car crime
Add to Lightbox - Lightbox

 
IMG_2992_car crime.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_2992_car crime
Add to Lightbox - Lightbox

 
IMG_2997_recovery.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_2997_recovery
Add to Lightbox - Lightbox

 
IMG_7528_car crime.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_7528_car crime
Add to Lightbox - Lightbox

 
IMG_7529_flooding.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_7529_flooding
Add to Lightbox - Lightbox

 
IMG_7535_abandoned.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_7535_abandoned
Add to Lightbox - Lightbox

 
IMG_7539_car crime.jpg On Thursday 19th November 2009 over 31cm of rain fell in 24 hours on the Cumbrian mountains. The single largest rainfall total in the British Isles since records began. It caused unprecedented flooding, with Cockermouth being particularly badly hit after both the Cocker and Derwent burst their banks. The main street was 5 feet underwater and £millions worth of damage was caused. This shots shows a car that had been abandoned in the flood waters on kirkstone Pass above Ambleside, which was then subsequently the victim of crime, as a passer by stole all the wheels of the vehicle.
 
IMG_7539_car crime
Add to Lightbox - Lightbox

 
366W4890_TV dinner.jpg TV dinners for sale on supermarket shelves UK
 
366W4890_TV dinner
Add to Lightbox - Lightbox

 
366W4909_organic.jpg Organic food for sale on supermarket shelves UK
 
366W4909_organic
Add to Lightbox - Lightbox

 
366W4857.jpg lorry wheels driving a long a road
 
366W4857
Add to Lightbox - Lightbox

Media Per Page