Global Warming Images
 

 
IMG_2693_sub station.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2693_sub station
Add to Lightbox - Lightbox

 
IMG_3905_huge.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3905_huge
Add to Lightbox - Lightbox

 
IMG_3907_towering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3907_towering
Add to Lightbox - Lightbox

 
IMG_3923_camera.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3923_camera
Add to Lightbox - Lightbox

 
IMG_3925_crew.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3925_crew
Add to Lightbox - Lightbox

 
IMG_4332_dry suit.jpg An offshore worker on his way out to the Walney offshore wind farm wearing protective clothing, Barrow in Furness, Cumbria, UK.
 
IMG_4332_dry suit
Add to Lightbox - Lightbox

 
IMG_2693_journalist.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_2693_journalist
Add to Lightbox - Lightbox

 
IMG_3866_PPE.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The  tower and turbine is then fixed onto the transition piece.
 
IMG_3866_PPE
Add to Lightbox - Lightbox

 
IMG_3894_Walney off shore wind farm.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3894_Walney off shore wind farm
Add to Lightbox - Lightbox

 
IMG_3905_renewable energy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3905_renewable energy
Add to Lightbox - Lightbox

 
IMG_3923_off shore wind farm.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3923_off shore wind farm
Add to Lightbox - Lightbox

 
IMG_3924_substation.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3924_substation
Add to Lightbox - Lightbox

 
IMG_3925_transformer.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3925_transformer
Add to Lightbox - Lightbox

 
IMG_3907_transformer.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the transformer substation that connects all the electric cable from each turbine, before sending the electricity ashore.
 
IMG_3907_transformer
Add to Lightbox - Lightbox

Media Per Page