Global Warming Images
 

 
IMG_3347_nacelle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3347_nacelle
Add to Lightbox - Lightbox

 
IMG_3348_offshore wind turbines.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3348_offshore wind turbines
Add to Lightbox - Lightbox

 
IMG_3349_nose cone.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3349_nose cone
Add to Lightbox - Lightbox

 
IMG_3350_mounting.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3350_mounting
Add to Lightbox - Lightbox

 
IMG_3353_blade mounting.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3353_blade mounting
Add to Lightbox - Lightbox

 
IMG_3359_nacelle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3359_nacelle
Add to Lightbox - Lightbox

 
IMG_3366_construction.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3366_construction
Add to Lightbox - Lightbox

 
IMG_3497_wind turbine blade.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3497_wind turbine blade
Add to Lightbox - Lightbox

 
IMG_3501_turbine blade.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3501_turbine blade
Add to Lightbox - Lightbox

 
IMG_3506_blade.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3506_blade
Add to Lightbox - Lightbox

 
IMG_3509_blade.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3509_blade
Add to Lightbox - Lightbox

 
IMG_3512_engineering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3512_engineering
Add to Lightbox - Lightbox

 
IMG_3516_covers.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3516_covers
Add to Lightbox - Lightbox

 
IMG_3518_construction.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3518_construction
Add to Lightbox - Lightbox

 
IMG_3519_cover.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3519_cover
Add to Lightbox - Lightbox

 
IMG_3521_renewable energy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3521_renewable energy
Add to Lightbox - Lightbox

 
IMG_3523_nose cone.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3523_nose cone
Add to Lightbox - Lightbox

 
IMG_3527_construction.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3527_construction
Add to Lightbox - Lightbox

 
IMG_3528_tower.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3528_tower
Add to Lightbox - Lightbox

 
IMG_3531_nacelle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3531_nacelle
Add to Lightbox - Lightbox

 
IMG_3532_nacelle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3532_nacelle
Add to Lightbox - Lightbox

 
IMG_3537_wind turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3537_wind turbine
Add to Lightbox - Lightbox

 
IMG_3541_Siemens.jpg Signs for off shore wind farms at their shore base in Mostyn, North Wales
 
IMG_3541_Siemens
Add to Lightbox - Lightbox

 
IMG_3542_Siemens.jpg Signs for off shore wind farms at their shore base in Mostyn, North Wales
 
IMG_3542_Siemens
Add to Lightbox - Lightbox

 
IMG_3544_wind farm.jpg Signs for off shore wind farms at their shore base in Mostyn, North Wales
 
IMG_3544_wind farm
Add to Lightbox - Lightbox

 
IMG_3547_Port of Mostyn.jpg Vestas offshore wind farm offices at Mostyn Port, North Wales
 
IMG_3547_Port of Mostyn
Add to Lightbox - Lightbox

 
IMG_3549_Vestas.jpg Vestas offshore wind farm offices at Mostyn Port, North Wales
 
IMG_3549_Vestas
Add to Lightbox - Lightbox

 
IMG_3550_Mostyn.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_3550_Mostyn
Add to Lightbox - Lightbox

 
IMG_3571_golf.jpg An offshore wind farm seen from Prestatyn golf club, North Wales.
 
IMG_3571_golf
Add to Lightbox - Lightbox

 
IMG_4301_nacelle.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4301_nacelle
Add to Lightbox - Lightbox

 
IMG_4302_turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4302_turbine
Add to Lightbox - Lightbox

 
IMG_4310_PPE.jpg PPE instruction signs inside a siemens offshore wind turbine destined for the Walney offshore wind farm.
 
IMG_4310_PPE
Add to Lightbox - Lightbox

Media Per Page