Global Warming Images
 

 
IMG_4395_wind turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4395_wind turbine
Add to Lightbox - Lightbox

 
IMG_4396_turbine tower.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4396_turbine tower
Add to Lightbox - Lightbox

 
IMG_4398_tower.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4398_tower
Add to Lightbox - Lightbox

 
IMG_4401_wind power.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4401_wind power
Add to Lightbox - Lightbox

 
IMG_4408_lightning strike.jpg A credit card recorder on the inside of an offshore wind turbine blade. This simple device records wether the blade has been hit by a lightning strike and potentially damaged.
 
IMG_4408_lightning strike
Add to Lightbox - Lightbox

 
IMG_4410_nose cone.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4410_nose cone
Add to Lightbox - Lightbox

 
IMG_4414_engineering.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4414_engineering
Add to Lightbox - Lightbox

 
IMG_4416_offshore wind turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4416_offshore wind turbine
Add to Lightbox - Lightbox

 
IMG_4420_Dong Energy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4420_Dong Energy
Add to Lightbox - Lightbox

 
IMG_4421_nose cone.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4421_nose cone
Add to Lightbox - Lightbox

 
IMG_4426_wind turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4426_wind turbine
Add to Lightbox - Lightbox

 
IMG_4427_turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4427_turbine
Add to Lightbox - Lightbox

 
IMG_4428_renewable energy.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4428_renewable energy
Add to Lightbox - Lightbox

 
IMG_4433_Siemens.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4433_Siemens
Add to Lightbox - Lightbox

 
IMG_4440_Mostyn.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4440_Mostyn
Add to Lightbox - Lightbox

 
IMG_4442_container.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.
 
IMG_4442_container
Add to Lightbox - Lightbox

 
IMG_4445_wind turbine.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site. This shot shows an enginner standing in the entrance to one of the turbine towers.
 
IMG_4445_wind turbine
Add to Lightbox - Lightbox

 
IMG_4446_PPE.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site. This shot shows an enginner standing in the entrance to one of the turbine towers.
 
IMG_4446_PPE
Add to Lightbox - Lightbox

 
IMG_4448_engineer.jpg The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria.  The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site. This shot shows an enginner standing in the entrance to one of the turbine towers.
 
IMG_4448_engineer
Add to Lightbox - Lightbox

 
IMG_4602_hydro power.jpg The overspill from Coedty reservoir which supplies water to the Dolgarrog hydro power station in Snowdonia, North Wales,
 
IMG_4602_hydro power
Add to Lightbox - Lightbox

 
IMG_3885_recycling.jpg Recycling bins at Bangor University, North Wales.
 
IMG_3885_recycling
Add to Lightbox - Lightbox

 
IMG_3890_green build.jpg The Welsh Environment Centre at Bangor University, North Wales.
 
IMG_3890_green build
Add to Lightbox - Lightbox

 
IMG_3891_environment centre.jpg The Welsh Environment Centre at Bangor University, North Wales.
 
IMG_3891_environment centre
Add to Lightbox - Lightbox

 
IMG_3374_flame.jpg Flaring off gas at a gas power station in Talacre, North Wales.
 
IMG_3374_flame
Add to Lightbox - Lightbox

 
IMG_3379_flare off.jpg Flaring off gas at a gas power station in Talacre, North Wales.
 
IMG_3379_flare off
Add to Lightbox - Lightbox

 
IMG_3391_flare.jpg Flaring off gas at a gas power station in Talacre, North Wales.
 
IMG_3391_flare
Add to Lightbox - Lightbox

 
IMG_3393_process plant.jpg Talacre gas powered station in North Wales.
 
IMG_3393_process plant
Add to Lightbox - Lightbox

 
IMG_3394_gas scrubber.jpg Talacre gas powered station in North Wales.
 
IMG_3394_gas scrubber
Add to Lightbox - Lightbox

 
IMG_3396_gas scrubber.jpg Talacre gas powered station in North Wales.
 
IMG_3396_gas scrubber
Add to Lightbox - Lightbox

 
IMG_3397_gas.jpg Talacre gas powered station in North Wales.
 
IMG_3397_gas
Add to Lightbox - Lightbox

 
IMG_3407_gas plant.jpg Talacre gas powered station in North Wales.
 
IMG_3407_gas plant
Add to Lightbox - Lightbox

 
IMG_3767_electricity pylon.jpg Electricity pylons traversing over Bwlch Y Ddeufaen on the edge of the Snowdonia Mountains, North Wales, carrying electricity from Dolgarrog hydro electric power station.
 
IMG_3767_electricity pylon
Add to Lightbox - Lightbox

Media Per Page